Legislation Details

File #: 26-8068    Version: 1 Name: Professional Engineering Services: Hula Drive and Parkside Drive Wastewater Improvements
Type: Agenda Item Status: Passed
File created: 1/6/2026 In control: City Council
On agenda: 1/20/2026 Final action:
Title: Authorize the City Manager to finalize and execute a Professional Engineering Services Contract with Teague Nall and Perkins, Inc. a Texas Corporation, for Hula Drive and Parkside Drive Wastewater Improvements, in the amount of $764,880.00.
Attachments: 1. Location Map

Title

Authorize the City Manager to finalize and execute a Professional Engineering Services Contract with Teague Nall and Perkins, Inc. a Texas Corporation, for Hula Drive and Parkside Drive Wastewater Improvements, in the amount of $764,880.00.

 

Body

This contract involves upsizing and rehabilitating existing wastewater infrastructure within Sewer Basin 13 to address historical overflows and reduce inflow and infiltration. Sewer Basin 13 is a defined area within the City that collects wastewater and conveys flows through the underground system to the regional treatment facility. The work includes replacing multiple linear feet of wastewater mains along Hula Drive, Viva Drive, Anthony Drive, and Parkside Drive.

 

Financial Implications

Funding for the design contract is allocated with Water and Sewer Funds.

 

Recommended/Desired Action

Staff recommends the City Manager be authorized to finalize and execute a Professional Engineering Services Contract with Teague Nall and Perkins, Inc.

 

Attachment(s)

Location Map

 

Drafter

Tracy Romo

 

Head of Department

Eric J. Gallt, P.E.