File #: 18-3841    Version: 1 Name: Bid No. 2019-024 - Gus Thomasson Road Reconstruction
Type: Agenda Item Status: Passed
File created: 11/15/2018 In control: City Council
On agenda: 12/3/2018 Final action: 12/3/2018
Title: Bid No. 2019-024 - Gus Thomasson Road Reconstruction, Utility & Drainage Improvements - US Highway 80 to Town East Boulevard. (Authorize the City Manager to finalize and execute a contract with low bidder Tiseo Paving Company for the base bid, Additive/Alternate 1 and Additive/Alternate 4, in the amount of $12,068,789.21).
Attachments: 1. Recommendation Letter, 2. Bid Tabulation - 2019-024, 3. Location Map, 4. Special Provisions – Liquidated Damages, Incentives and Disincentives, 5. Bid Evaluation - Available Funding.pdf
Title
Bid No. 2019-024 - Gus Thomasson Road Reconstruction, Utility & Drainage Improvements - US Highway 80 to Town East Boulevard.
(Authorize the City Manager to finalize and execute a contract with low bidder Tiseo Paving Company for the base bid, Additive/Alternate 1 and Additive/Alternate 4, in the amount of $12,068,789.21).

Body
Name of Department
Public Works

Project/Budgeted Amount
$14,300,000.00

Sum of Bid/Bid Amount
$12,068,789.21

This project will reconstruct Gus Thomasson Road from US Highway 80 to Town East Boulevard. Infrastructure improvements include replacing aging water, sanitary sewer, and upgrading the drainage infrastructure through the corridor. The pavement section for Gus Thomasson will be substantially increased to a 12-inch pavement section in the high traffic areas from US Highway 80 to Towne Centre Drive and from North Mesquite Drive to Town East Boulevard. The remaining section will be increased to a 10-inch pavement section from Towne Centre Drive to North Mesquite Drive. Hardscaping and landscaping amenities have been integrated into the project that include monuments for the astronaut streets, stamped concrete, river cobble, decomposed granite, and trees and shrubs.

The Gus Thomasson Road Reconstruction project (Base Bid, Additive/Alternate 1, and Additive Alternate 4) was presented at a public meeting held on June 30, 2016. At that time, the public was provided a survey pertaining to keeping the astronaut streets closed, adding landscaped screening, adjusting the roadway alignment, adding a hike and bike trail and including neighborhood identity elements. The input received from the public hearing and the results from the survey were incorporated into the design scope of the project. The City Council approved an engineering contract on December 5, 2016, with Binkley & Barfield, Inc., for the design of this project.

As set forth in the plans and specifications, the project is designed to include the construction of approxim...