File #: 18-3479    Version: 1 Name: Westover Greenbelt Pedestrian Bridge Replacement 2018-004
Type: Agenda Item Status: Passed
File created: 5/23/2018 In control: City Council
On agenda: 6/4/2018 Final action: 6/4/2018
Title: Bid No. 2018-004 - Westover Greenbelt Pedestrian Bridge Replacement. (Authorize the City Manager to finalize and execute a contract with low bidder Wall Enterprises, in the amount of $119,918.10.)
Attachments: 1. Bid Tabulation - 2018-004, 2. Bid Tabulation - Engineering, 3. Recommendation Letter, 4. Location Map
Title
Bid No. 2018-004 - Westover Greenbelt Pedestrian Bridge Replacement.
(Authorize the City Manager to finalize and execute a contract with low bidder Wall Enterprises, in the amount of $119,918.10.)

Body
Name of Department
Public Works

Project/Budgeted Amount
$450,000.00

Sum of Bid/Bid Amount
$119,918.10

The fiscal year 2017 Drainage Utility District (DUD) budget includes funding for the design and replacement of park pedestrian bridges and various drainage improvements. The Westover Greenbelt Pedestrian Bridge Replacement (WGPBR) was included in the proposed improvements and has been separated out as a stand-alone project to expedite the construction. The City Council approved an engineering contract on August 21, 2017, with Walter P. Moore & Associates, Inc., for the design of all proposed improvements for the project.

This bid is for the WGPBR portion of the proposed drainage improvements. The attached location map delineates the location of the project area. The WGPBR consists of the construction of new bridge abutments, the placement of a 70-foot, steel pedestrian bridge, and approximately 75 feet of concrete trail construction.

Financial Implications
Bid notices were broadcast through the BidSync electronic bidding system, published in the Daily Commercial Record newspaper and posted on the City's website. Four responsive bids were received and opened on May 15, 2018.

Walter P. Moore and Associates, Inc., reviewed references and other qualification information and determined Wall Enterprises to have sufficient references and qualifications as they have been in the industry for more than 30 years as a General Contractor.

The Drainage Utility District (DUD) budget includes adequate funding for this project. Construction should begin in June 2018 and be completed by September 2018.

Recommended/Desired Action
Staff recommends award to Wall Enterprises.

Attachment(s)
Bid Tabulation
Bid Tabulation - Engineering
Recommendation Letter
Location Map...

Click here for full text