File #: 19-4348    Version: 1 Name: NMC at Tripp Road-LOMR and Drainage Study
Type: Agenda Item Status: Passed
File created: 8/19/2019 In control: City Council
On agenda: 9/16/2019 Final action: 9/16/2019
Title: Authorize the City Manager to finalize and execute a professional engineering services contract with Halff Associates, Inc., for the preparation of a Letter of Map Revision (LOMR) for North Mesquite Creek at the Tripp Road and Belt Line Road Intersection and to model drainage improvements to North Mesquite Creek that would lower flood elevations and remove properties from the floodplain, in the amount of $91,700.00.
Attachments: 1. Location Map, 2. Photo of Flooding on Belt Line-South of Tripp, 3. Photo of Flooding on Belt Line South of Tripp Rd
Title
Authorize the City Manager to finalize and execute a professional engineering services contract with Halff Associates, Inc., for the preparation of a Letter of Map Revision (LOMR) for North Mesquite Creek at the Tripp Road and Belt Line Road Intersection and to model drainage improvements to North Mesquite Creek that would lower flood elevations and remove properties from the floodplain, in the amount of $91,700.00.

Body
In July 2014, the Federal Emergency Management Agency (FEMA) adopted new floodplain mapping for all of Dallas County. This new mapping generally reduced the number of homes in Mesquite affected by the FEMA floodplain. Homes in the FEMA floodplain must purchase flood insurance if they have a mortgage loan with federal mortgage insurance, such as Federal Housing Administration (FHA) or Veteran's Administration (VA) loans.

North Mesquite Creek at Tripp Road - Belt Line Road Intersection is an area that has 26 homes, a church and several businesses within the FEMA floodplain. Many of these homes were not in the FEMA floodplain before the 2014 mapping update.

This contract is for a drainage study and preparation of a FEMA Letter of Map Revision (LOMR) on North Mesquite Creek at the intersection of Belt Line Road and Tripp Road. The drainage study will develop three options for drainage improvements necessary to reduce flood elevations in the adjacent neighborhood, thereby, removing homes and businesses from the floodplain and reducing flooding of this critical intersection. The contract will also prepare budget estimates for the recommended option for the proposed drainage improvement.

Financial Implications
This design contract will be funded through the Drainage Utility District.

Recommended/Desired Action
Staff recommends approval of a contract with Halff Associates, Inc.

Attachment(s)
Location Map Showing Floodplain
Photographs of Flooding at Belt Line Road at Tripp Road

Drafter
Matthew Holzapfel, P.E.

Head of Department
Matthew Hol...

Click here for full text